Buchans ecological engineering treatment assessment : long-term performance evaluation and site visit report (2009)
dc.contributor.author | Kalin, Margarete A. | |
dc.coverage.spatial | geo:48.4921,-56.5230 | |
dc.coverage.spatial | Buchans, Nfld. Mine Site (Buchans, Nfld.) | |
dc.date.accessioned | 2018-02-14T16:59:05Z | |
dc.date.available | 2018-02-14T16:59:05Z | |
dc.date.issued | 2009-10 | |
dc.description | The decommissioning effort of the Buchans Waste Management area was carried out by Boojum Research Ltd for ASARCO between 1988 and 1998. | en_CA |
dc.description.abstract | The decommissioning effort of the Buchans Waste Management area was carried out by Boojum Research Ltd for ASARCO between 1988 and 1998. A biological polishing pond system was installed treating combined effluents from Orientals, Valley Seeps and Drainage Tunnel. Work in the Hospital tailings spill area addressed the distribution of the metals to a depth of 0.5m and defined the contaminant loading to the Turnpike and the Buchans River. Based on these data a fresh water diversion ditch was constructed and test plots were set up to generate a hardpan below ground, where iron and metals precipitated with phosphate sand and a cover was provided for vegetation to prevent erosion. The test results were very positive and the PHITO (Phosphate Heterotroph Inhibition of Tailings-Oxidation) was implemented prior to the death of G. Neary. Boojum Research Ltd is a research company, developing sustainable decommissioning technology based on Ecological Engineering principles. | en_CA |
dc.identifier.uri | https://laurentian.scholaris.ca/handle/10219/2892 | |
dc.language.iso | en | en_CA |
dc.relation.ispartofseries | Boojum Technical Reports;AB073 | |
dc.subject | decommissioning | en_CA |
dc.subject | Buchans Waste Management area | en_CA |
dc.subject | polishing pond system | en_CA |
dc.subject | Hospital tailings spill area | en_CA |
dc.subject | PHITO | en_CA |
dc.subject | Phosphate Heterotroph Inhibition of Tailings-Oxidation | en_CA |
dc.title | Buchans ecological engineering treatment assessment : long-term performance evaluation and site visit report (2009) | en_CA |
dc.type | Technical Report | en_CA |